Admin Guide

Created: 2026-05-24 10:00 · Updated: 2026-05-24 10:00

Admin mode gives administrators access to the public library, the approval workflow, and central configuration. It is activated via the Ribbon and is PIN-protected.


Prerequisite: Configure the Public Path

The Ribbon button Admin View is only visible if a public network path has been configured. You set this path under:

Admin Tab → Settings → Administrator → Public Network Path

Without a configured public path, admin mode is unavailable.


Activating Admin View

  1. Click PPPTools → Admin View in the PowerPoint Ribbon
  2. First-time setup: If no PIN has been set yet, a setup dialog appears — enter and confirm a new PIN (at least 4 characters)
  3. Subsequent logins: Enter the PIN and confirm with OK
  4. After successful login, the Admin Tab appears in the Task Pane

Warning

In admin mode, all saved content is written directly to the public library. Changes are immediately visible to all users (after their next synchronization).

Deactivating Admin View

Click PPPTools → Admin View again — the Admin Tab disappears and the view returns to Snippets.


Admin Tab — Overview

The Admin Tab is divided into two main areas:

Area Sub-Tabs Content
Review Center Approvals · Approved · Rejected Approval workflow for submitted content
Settings Administrator · Backup Public path, PIN management, data backup

Review Center

Approvals — Review Submitted Content

Users can submit Snippets, Slides, and Storylines from their private library for inclusion in the public library. These appear in the Approvals sub-tab.

Approving content:

  1. Open the Approvals sub-tab
  2. Select an entry in the list
  3. Review and adjust the metadata on the right if needed
  4. Click ✓ Approve — the content is moved to the public library and the manifest is updated

Rejecting content:

  1. Select the entry
  2. Click ✗ Reject
  3. An input dialog appears — enter a rejection reason (optional, multi-line). Confirm with Reject or cancel the action with Cancel.
  4. The submitter will see a notification banner the next time they open the Task Pane. In the Manage area, the rejection reason is displayed directly below the publish status field.

Approved — Manage Published Content

The Approved sub-tab lists all content currently in the public library.

  • Preview and metadata are visible in the right panel
  • ✗ Remove from Public deletes the content from the public library and updates the manifest

Rejected — Declined Submissions

The Rejected sub-tab shows all submissions that have already been declined, including the rejection date and — if provided — the rejection reason (highlighted in red in the detail panel).


Settings

Administrator

The Administrator sub-tab contains the central configuration for the admin area.

Public Network Path

The shared network path where the public library is stored.

Action Description
Browse Select a folder in the file system
Save Path is updated — existing content stays at the old location
Move Path is updated and all public content is physically moved to the new folder

Warning

Move transfers all files from the old to the new folder (Snippets, Slides, Storylines, pending submissions, configuration). Make sure the target path is reachable and writable.

Managing the Admin PIN

The PIN protects admin mode. It is stored as a SHA-256 hash in the public share — only people with access to the network path can know the PIN.

Changing the PIN:

  1. Enter the Current PIN
  2. Enter the New PIN (at least 4 characters)
  3. Confirm PIN (repeat the new PIN)
  4. Click Save PIN

Note

The PIN is valid for all admin sessions on this public share. During first-time setup (no PIN yet), the "Current PIN" field is not required.

Backup

The Backup sub-tab enables export and import of content and settings as a ZIP file.

→ Full documentation: Backup & Restore


Creating Content Directly in Admin Mode

Content can also be created directly via the Ribbon while in admin mode (Save Snippet/Slide). It is automatically classified as Public and the manifest is updated — all users will receive the new content at the next sync.


Managing Value Lists

Admins maintain the central selection lists for all metadata fields under:

PPPTools → Settings → Value Lists

Value Lists Documentation


Editing a Public Slide

Existing public slides can be opened directly in Admin View, edited in PowerPoint, and updated with a new preview image.

Edit Slide — Admin Workflow


Synchronization

Users synchronize automatically when the Task Pane is opened (at most every 5 minutes). The manifest contains a version number — if it has changed, new/modified/deleted public content and updated value lists are applied.

Sync Settings